Ville de Johannesburg (City Power)
May 2026 · South AfricaAnnounced by the city on 29 May 2026; drawdowns from 2025/26 to 2027/28.
Activity : Power transmission and distribution
Instrument : ZAR 3.8bn (EUR 200m) rand-denominated concessional loan, fixed 8.56%, 15 years, repayments from May 2031, unsecured
Metering, network and modernisation at City Power (Just Energy Transition programme).
Why they invested
- Local-currency municipal finance
Source : joburg.org.zaN1 · Primary source · Other sources : Engineering News